Project

General

Profile

Actions

Bug #3989

closed

[Workbench] [DRAFT] Fix clock/node time reporting on Workbench pipeline page

Added by Tom Clegg over 9 years ago. Updated 2 months ago.

Status:
Closed
Priority:
Normal
Assigned To:
-
Category:
Workbench
Target version:
-
Story points:
-

Description

Including:
  • No figures should include time spent queued
  • When jobs are reused in a pipeline, time of reused jobs should be reported separately, and not included in any of the pipeline's other time stats
  • Pipeline/job timing figures should not mislabel "sum of wallclock time of each task" as "CPU time"
  • Fix reporting for failed jobs (see #5651 notes)

Subtasks 1 (0 open1 closed)

Task #5651: Fix reported scaling factor for failed jobs (see notes)Closed03/01/2024Actions
Actions

Also available in: Atom PDF